2022-2026 Capital Improvement Program.pdf
Contact Tim Wilkey Depar tment PUBLIC WORKS
V3164
Pr oject #
Pr oject Name Retur n Activated Sludge Pump Replacement
Type Multi-Phase
Useful Life 20 years
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Categor y Wastewater Treatment
Pr ior ity Essential (2)
Description The project would include the replacement of return activated sludge pumps. This includes all pumps and any piping/structural modifications required to fit the pumps. Justification These pumps have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and treatment of the wastewater resulting in violations of our NPDES discharge permit. Total Pr oject Cost: $1,009,000 Status Active
Expenditur es
Total
2022
2023
2024
2025
2026
80,000 823,000 16,000
80,000 823,000 16,000
PLANNING/DESIGN CONSTRUCTION
INSPECTION
8,000
8,000
ADMINISTRATION CONTINGENCY
82,000
82,000
1,009,000
1,009,000
Total
Funding Sour ces WASTEWATER FUND
Total
2022
2023
2024
2025
2026
1,009,000 1,009,000
1,009,000 1,009,000
Total
Budget Impact/Other New pumps would increase pump efficiency, but lower energy consumption and maintenance costs. The estimated reduction in operating expenditures is less than $10,000 per year.
613