2022-2026 Capital Improvement Program.pdf
Contact Tim Wilkey Depar tment PUBLIC WORKS
V3165
Pr oject #
Pr oject Name Replacement of Influent Pump Station Pumps
Type One Phase
Useful Life 20 years
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Categor y Wastewater Treatment
Pr ior ity Essential (2)
Description Replacement of the influent pump station pumps 1301A, 1302A, and 1303A and any piping/electrical modifications that will be required. Justification There are 6 influent pumps currently installed. The three discussed above were installed in 2002 and are nearing the end of their design life. These pumps have had significant repairs over the past 5 years but those repairs have not extended their design life. These pumps are close coupled centrifugal style pumps and will be replaced with dry pit submersible pumps to match the existing style of the three remaining pumps. There will be piping modifications, upgrading of controls and includes installation. The current pumps are rated at 10 milllion gallons per day (MGD), the newer pumps will be 12 MGD. Total Pr oject Cost: $605,000 Status Active
Expenditur es
Total
2022
2023
2024
2025
2026
25,000 521,000
25,000 521,000
PLANNING/DESIGN CONSTRUCTION
4,000 2,000
4,000 2,000
INSPECTION
ADMINISTRATION CONTINGENCY
53,000 605,000
53,000 605,000
Total
Funding Sour ces WASTEWATER FUND
Total
2022
2023
2024
2025
2026
605,000 605,000
605,000 605,000
Total
Budget Impact/Other The existing pumps have increasing maintenance cost and operation costs when they are OOS. New pumps will improve pump efficiency, lower power cost and reduced maintenance cost. The estimated reduction in operating expenditures is less than $10,000 per year.
614
Made with FlippingBook. PDF to flipbook with ease