2022-2026 Capital Improvement Program.pdf

Contact Tim Wilkey Depar tment PUBLIC WORKS

V3175

Pr oject #

Pr oject Name Influent Flow Monitor ing

Type One Phase

Useful Life 20 years

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Categor y Wastewater Treatment

Pr ior ity Critical (1)

Description Place Parshall flume(s) directly downstream of the grit tank channel isolation valves including ultrasonic measuring. This will require channel modifications, flume and sensor installation and programming into the headworks PLC. Justification Flow measuring was changed from a Parshall flume to an in-channel area velocity sensor/meter in the last plant upgrade. That sensor/meter failed and subsequent efforts at flow measurement lack staff confidence in being greater than 80% accurate. Parshall flumes have been used in the wastewater industry for decades with 99+% accuracy and confidence. Total Pr oject Cost: $251,000 Status Active

Expenditur es

Total

2022

2023

2024

2025

2026

25,000 200,000

25,000 200,000

PLANNING/DESIGN CONSTRUCTION

4,000 2,000

4,000 2,000

INSPECTION

ADMINISTRATION CONTINGENCY

20,000 251,000

20,000 251,000

Total

Funding Sour ces WASTEWATER FUND

Total

2022

2023

2024

2025

2026

251,000 251,000

251,000 251,000

Total

Budget Impact/Other This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per year.