2022-2026 Capital Improvement Program.pdf
Contact Jonathan Durst Depar tment PUBLIC WORKS
W3320
Pr oject #
Pr oject Name Hwy 6 (Fairmeadows to Ind Par k Rd) Water Main Repl
Type One Phase
Useful Life 70 years
MATCH % NONE GRANTEE NONE
TIF DISTRICT Lower Muscatine/Ind Park Rd PLAN None
Categor y Water Operations
Pr ior ity Critical (1)
Description Replace approximately 2,000 feet of 1964 16-inch ductile iron water main along the north side of Highway 6 from Fairmeadows Blvd. to Industrial Park Rd. with 16-inch PVC water main. Justification This water main has had five (5) water main breaks since the year 2000, four (4) of which have happened in 2018/2019. The type of break have been majority corrosion related and it is expected to continue to have main breaks on this main until it is replaced due to corrosive soils. Due to the size and relative location of the water main in the distribution system the breaks on this line are very disruptive - large pressure swings that cause other water quality and integrity issues as well as loss of service to critical customers. Total Pr oject Cost: $661,500 Status Active
Expenditur es
Total
2022
2023
2024
2025
2026
67,500
67,500 540,000 54,000 661,500
PLANNING/DESIGN CONSTRUCTION
540,000 54,000 594,000
INSPECTION
67,500
Total
Funding Sour ces
Total
2022
2023
2024
2025
2026
67,500 67,500
594,000 594,000
661,500 661,500
WATER FUND
Total
Budget Impact/Other Main breaks on average cost approximately $10,000 each to repair. The main breaks on this stretch of Hwy 6 are significant enough to cause cascading effects such as more main breaks or the need to flush the distribution system which increases costs. Therefore the replacement of this main will have a direct impact on the operational budget lessening main break repairs and indirectly by increasing system integrity overall. Savings is anticipated to average $10,000 to $20,000 per year.
632