Contact Jonathan Durst Depar tment PUBLIC WORKS

W3322

Pr oject #

Pr oject Name Collector Well #2 Cleaning and Upgr ade

Type One Phase

Useful Life 70 years

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Categor y Water Operations

Pr ior ity Critical (1)

Description Clean and cap portions on the existing laterals of Collector Well #2 and install new 12-inch laterals to increase the production capacity of this raw water well. Justification Collector Well #2 has degraded specific capacity (amount of water yield per foot of well height) and will continue to decline as the pore spaces in the surrounding geologic formations plug with fines. Therefore to maintain the usefulness of this high quality water source and to increase its yield capacity lateral cleaning and lateral installation are necessary. Total Pr oject Cost: $1,000,000 Status Active

Expenditur es

Total

2022

2023

2024

2025

2026

100,000

100,000 900,000

PLANNING/DESIGN CONSTRUCTION

900,000 900,000

100,000

1,000,000

Total

Funding Sour ces

Total

2022

2023

2024

2025

2026

100,000 100,000

900,000 900,000

1,000,000 1,000,000

WATER FUND

Total

Budget Impact/Other

Contact Jonathan Durst Depar tment PUBLIC WORKS

W3323

Pr oject #

Pr oject Name Water Distr ibution Asset Inventor y

Type One Phase

Useful Life 10 years

MATCH % NONE GRANTEE NONE

TIF DISTRICT None PLAN None

Categor y Water Operations

Pr ior ity Essential (2)

Description Locate with survey grade accuracy all hydrants, valves, tanks, and other above ground accessible water distribution appertenances and deliver in a geographic information system geometric network with associated metadata for asset management functions. Justification Asset management requires an accurate asset inventory to reliably know the number, location, and information regarding above and below ground assets. The budget provided is based on an $18 per structure cost with about 10,000 structures (hydrants, valves, etc.). Total Pr oject Cost: $250,000 Status Active

Expenditur es

Total

2022

2023

2024

2025

2026

20,000 230,000 250,000

20,000 230,000 250,000

PLANNING/DESIGN CONSTRUCTION

Total

Funding Sour ces

Total

2022

2023

2024

2025

2026

250,000 250,000

250,000 250,000

WATER FUND

Total

Budget Impact/Other This project will have a negligible impact on the operating budget.