Contact Jen Jordan Depar tment PUBLIC WORKS
L3335
Pr oject #
Pr oject Name Landfill Dual Extr action System Expansion
Type One Phase
Useful Life 20 years Categor y Landfill
MATCH % NONE GRANTEE NONE
TIF DISTRICT None PLAN None
Pr ior ity Efficiency Improvement (3)
Description This project includes the design and installation of an expansion of the Landfill Dual Extraction System, which was originally constructed in 2018. This project will expand the current system (13 pnuematic pumps and 4 solar pumps) to include pumps in 8-9 additional wells and add SCADA monitoring to the proposed new and existing pumps. Justification The expansion of the Landfill's Dual Extraction System will positively impact eight or nine more wells, which have liquid levels that are close to or exceed the screen within them. Having high liquid levels limits or prevents gas from being able to be pulled from those wells. Expansion of the Dual Extraction System will allow landfill operators to better control leachate and gas management onsite. This will enhance operator functionality and reduce manual labor time. Adding SCADA greatly improves monitoring capabilities and efficiencies for landfill staff. Total Pr oject Cost: $600,000 Status Active
Expenditur es
Total
2022
2023
2024
2025
2026
55,000
55,000 485,000 50,000 10,000 600,000
PLANNING/DESIGN CONSTRUCTION
485,000 50,000
INSPECTION
5,000
5,000
ADMINISTRATION
60,000
540,000
Total
Funding Sour ces LANDFILL FUND
Total
2022
2023
2024
2025
2026
60,000 60,000
540,000 540,000
600,000 600,000
Total
Budget Impact/Other Adding SCADA monitoring to the new and existing pumps will increase staff efficiency by allowing central monitoring., but but the annual savings are expected to be less than $10,000 per year.