Project Name Tower Place Drainage Modifications
One Phase
Type
50 years
Useful Life
GRANTEE NONE
PLAN None
Parking Operations
Category
MATCH % NONE
TIF DISTRICT None
Critical (1)
Priority
Description This project will modify the existing drainage pipe network and divert storm water from the upper decks to the exterior of the structure rather than routing it through the lower level. Total Project Cost: $237,500 Status Active
Justification The lower level of Tower Place Parking Ramp repeatedly floods during high intensity rain events causing significant property damage.
Expenditures
Total
2022
2023
2024
2025
2026
PLANNING/DESIGN
50,000
50,000
CONSTRUCTION
150,000
150,000
INSPECTION
15,000
15,000
ADMINISTRATION
7,500
7,500
CONTINGENCY
15,000
15,000
237,500
237,500
Total
Funding Sources
Total
2022
2023
2024
2025
2026
PARKING FUND
237,500
237,500
237,500
237,500
Total
Budget Impact/Other There is no anticipated impact to the operating budget.