Project Name Wastewater Treatment Facility Imp 2022
Wastewater Treatment
Category
GRANTEE NONE
PLAN None
Critical (1)
Priority
MATCH % NONE
TIF DISTRICT None
Active
Status
Total Project Cost: $536,000
Description Place Parshall flume(s) directly downstream of the grit tank channel isolation valves including ultrasonic measuring. This will require channel modifications, flume and sensor installation and programming into the headworks PLC.
Justification Flow measuring was changed from a Parshall flume to an in-channel area velocity sensor/meter in the last plant upgrade. That sensor/meter failed and subsequent efforts at flow measurement lack staff confidence in being greater than 80% accurate. Parshall flumes have been used in the wastewater industry for decades with 99+% accuracy and confidence.
Prior
Expenditures
Total
2024
2025
2026
2027
2028
CONSTRUCTION
285,000
285,000
251,000
285,000
285,000
Total
Total
Prior
Funding Sources
Total
2024
2025
2026
2027
2028
WASTEWATER FUND
285,000
285,000
251,000
285,000
285,000
Total
Total
Budget Impact/Other This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per year.